Progress continues apace at the brewery as we roll into winter.

Historic barn boards reclaimed from a local tear-down have been stained and installed in our future tap room. The kids and adults have both had fun with the construction. Metal siding has been attached to the interior skeleton of the Morton shed, giving definition and life to the structure.

Lights have been hung, giving drama to and filling out the space — a very satisfying endeavor. In addition, plumbing and HVAC is going in.

Exterior patios and walkways have been poured, future vantage points to survey the landscape and enjoy a drink (or two).

Now comes a much anticipated part — placing and hooking up the brewing equipment!